CPCN Cases

(Certificates of Public Convenience and Necessity)

2017

  • Case No. 9471–Transource Maryland, LLC
    Construction of two 230 kV transmission lines (Harford County/ Washington County)
    Pre-hearing conference: February 16, 2018 at 1:00 p.m.
  • Case No. 9470–Potomac Edison Company
    Modification of the Ringgold-Catoctin 138 kV Transmission Line (Frederick County/Washington County)
    Pre-hearing conference: February 5, 2018 at 10:00 a.m.
  • Case No. 9469–Energy Ventures IPP, LLC
    10MW solar facility (Prince George’s County)
    Pre-hearing conference: February 5, 2018 at 11:00 a.m.
  • Case No. 9466–TPE Maryland Solar Land Holdings, LLC
    2.25MW solar facility (Prince George’s County)
    Public hearings: April 18, 2018 and May 31, 2018 (time and locations TBD)
  • Case No. 9465–TPE Maryland Solar Land Holdings, LLC
    2.425MW solar facility (Prince George’s County)
    Public hearings: April 3, 2018 and May 17, 2018 (time and locations TBD)
  • Case No. 9464–MD Solar 1, LLC
    32.5MW solar facility (Charles County)
    Public hearings: March 20, 2018 and May 3, 2018 (times and locations TBD)
  • Case No. 9463–MD Solar 2, LLC
    27.5MW solar facility (Charles County)
    Public hearings: February 20, 2018 at 7pm in LaPlata  and April 20, 2018 (time and location TBD)
  • Case No. 9457–Richfield Solar Energy, LLC
    50.0MW solar facility (Dorchester County)
    Public hearing: March 13, 2018 (time and location TBD)
  • Case No. 9318–Dominion Energy Cove Point LNG, LP (modifications to existing CPCN)
  • Case No. 9454–Brick Kiln Road Solar, LLC
    5.4MW solar facility (Wicomico County)
    Proposed Order: January 5, 2018
  • Case No. 9451–Chesapeake Solar, LLC
    9.0MW solar facility (Cecil County)
  • Case No. 9450–Casper Solar Center, LLC
    36.7MW solar facility (Queen Anne’s County)
    Public hearing: March 12, 2018 (time and location TBD)
  • Case No. 9446—Sol Phoenix Solar, LLC
    2.5MW solar facility (Prince George’s County)
    Order No. 88462: November 9, 2017
  • Case No. 9439—Biggs Ford Solar Center, LLC
    15.0MW solar facility (Frederick County)
    Proposed Order: December 5, 2017
     

2016

2015